Find answers, ask questions and become part of the Loxone Community.
Hi, I was invited to upgrade the Loxone Config, I presume to 12.2.1, by the app, which I did. I have not meddled with the config.
Has anyone else had a problem? I now have my heating system going continually and several lights on sensors not working as planned any more.
I have had messages which I discovered on the config app…
There are "sensors not monitored" – all temperature sensors
Run on increased demand – ouside of range of values
Comfort temp setpoint – ouside of range of values
I also have heated towel rail economy timers outside of value range – we don’t use those.
Any ideas for a quick fix?
 | Monday | Tuesday | Wednesday | Thursday | Friday |
---|---|---|---|---|---|
0830-0900 | Welcome | Arrival and Exchange | Arrival and Exchange | Arrival and Exchange | Arrival and Exchange |
Unit 1 | Easy Lighting Planning Square meter formulas. Room types, Direct/Indirect |
Automatic Basic Lighting Presence Sensor Air/Tree |
Shading & Automation Controls vs Automation  configuration shading types |
Multiroom Audio System, scaling, simple audio planning |
Media controller IR and RS Protocols, AVR |
Unit 2 | Intuitive Operating Concept Room types & moods |
Presence Optimization Exercises by type of room |
System Protection Functions Storm, frost, privacy, break-in |
Cabling & Configuration Audioserver Extension speaker |
Operating Concept Specific Operating modes, Touch Pure Flex |
Unit 3 | Configuration Room Types Basic Configuration |
Presence Areas Practice P/1-8 |
Optimise Protection Functions Practical exercises by type |
Operation & Connections Line In/Out, SPDIF Signal converter |
Optimise Conference Room Control and programming |
1200 | Lunch Break | Lunch Break | Lunch Break | Lunch Break | Lunch Break & wrap up |
Unit 4 | Lighting Controller In-depth T5/1-8, lC1-4, M+/-, Mix |
Technologies Dali, DMX, PWM |
Weather & Sunshine Weather station & forecasts |
Smart Home Functions TTS, Announcements, Bell |
 |
Unit 5 | Operating Concept Advanced Exercise by type of room |
Daylight Control HCL Practical implementation |
Automatic Sun Position Control Protection types IR/UV/Lux |
HiFi and Ambient Sound Signum and Install 7 |
 |
Unit 6 | Operating Concept Specific     Hotel, Office, Auditorium | Constant Light Control Measurement, control, implementation |
Automatic Sun Position Control Optimization of parameters |
Acoustics & Sound Optimization   Optimize audio planning |  |
Unit 7 | Touch Pure Flex Scrolling text, master brightness |
Signalization via Light Practice example |
Operating Concept Specific Practical examples | Audioserver in combination   Exercises Lan/Tree Turbo |  |
Booking Request for CPD
Please complete the following details as part of your request to book this CPD.
Once we have received your details, we will be in touch to discuss your request further.
From your first enquiry to the finishing touches on your project, Loxone and your Loxone Partner will be with you all the way. Benefit from the experience that we have gained through the realisation of over one hundred thousand projects worldwide to ensure your project exceeds your expectations.