Find answers, ask questions and become part of the Loxone Community.
This has always been an issue as far as I know since the climate controller came into play. The H (linked to boiler) stays on for ages even when there is no heating demand.
Up to now, apart from increased gas consumption, it has not been an issue since I’ve only been dealing with system/combi boilers which allow for this. This has been the case in each install using the climate controller block.
I currently have the please of working with a 1980s, gravity fed boiler. No pump, etc.
Whilst I am controlling the pump manually and running it for 10 minutes (switch off delay block) after the boiler has switched off, the boiler doesn’t switch off for ages even when there is no heating demand. I have reduced the TPoff parameter to minimum (180) but has appeared to not make any difference. Result – boiler has to be reset 2-3 times a day.
Photo enclosed of heating demand from app. Liveview in config confirms this.
How is everybody else dealing with this quirk of the climate controller block, or am I special?
 | Monday | Tuesday | Wednesday | Thursday | Friday |
---|---|---|---|---|---|
0830-0900 | Welcome | Arrival and Exchange | Arrival and Exchange | Arrival and Exchange | Arrival and Exchange |
Unit 1 | Easy Lighting Planning Square meter formulas. Room types, Direct/Indirect |
Automatic Basic Lighting Presence Sensor Air/Tree |
Shading & Automation Controls vs Automation  configuration shading types |
Multiroom Audio System, scaling, simple audio planning |
Media controller IR and RS Protocols, AVR |
Unit 2 | Intuitive Operating Concept Room types & moods |
Presence Optimization Exercises by type of room |
System Protection Functions Storm, frost, privacy, break-in |
Cabling & Configuration Audioserver Extension speaker |
Operating Concept Specific Operating modes, Touch Pure Flex |
Unit 3 | Configuration Room Types Basic Configuration |
Presence Areas Practice P/1-8 |
Optimise Protection Functions Practical exercises by type |
Operation & Connections Line In/Out, SPDIF Signal converter |
Optimise Conference Room Control and programming |
1200 | Lunch Break | Lunch Break | Lunch Break | Lunch Break | Lunch Break & wrap up |
Unit 4 | Lighting Controller In-depth T5/1-8, lC1-4, M+/-, Mix |
Technologies Dali, DMX, PWM |
Weather & Sunshine Weather station & forecasts |
Smart Home Functions TTS, Announcements, Bell |
 |
Unit 5 | Operating Concept Advanced Exercise by type of room |
Daylight Control HCL Practical implementation |
Automatic Sun Position Control Protection types IR/UV/Lux |
HiFi and Ambient Sound Signum and Install 7 |
 |
Unit 6 | Operating Concept Specific     Hotel, Office, Auditorium | Constant Light Control Measurement, control, implementation |
Automatic Sun Position Control Optimization of parameters |
Acoustics & Sound Optimization   Optimize audio planning |  |
Unit 7 | Touch Pure Flex Scrolling text, master brightness |
Signalization via Light Practice example |
Operating Concept Specific Practical examples | Audioserver in combination   Exercises Lan/Tree Turbo |  |
Booking Request for CPD
Please complete the following details as part of your request to book this CPD.
Once we have received your details, we will be in touch to discuss your request further.
From your first enquiry to the finishing touches on your project, Loxone and your Loxone Partner will be with you all the way. Benefit from the experience that we have gained through the realisation of over one hundred thousand projects worldwide to ensure your project exceeds your expectations.