|
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
0830-0900 |
Welcome |
Arrival and Exchange |
Arrival and Exchange |
Arrival and Exchange |
Arrival and Exchange |
Unit 1 |
Easy Lighting Planning Square meter formulas. Room types, Direct/Indirect |
Automatic Basic Lighting Presence Sensor Air/Tree
|
Shading & Automation Controls vs Automation  configuration shading types
|
Multiroom Audio System, scaling, simple audio planning |
Media controller IR and RS Protocols, AVR |
Unit 2 |
Intuitive Operating Concept Room types & moods |
Presence Optimization Exercises by type of room |
System Protection Functions Storm, frost, privacy, break-in |
Cabling & Configuration Audioserver Extension speaker |
Operating Concept Specific Operating modes, Touch Pure Flex |
Unit 3 |
Configuration Room Types Basic Configuration |
Presence Areas Practice P/1-8 |
Optimise Protection Functions Practical exercises by type |
Operation & Connections Line In/Out, SPDIF Signal converter |
Optimise Conference Room Control and programming |
1200 |
Lunch Break |
Lunch Break |
Lunch Break |
Lunch Break |
Lunch Break & wrap up |
Unit 4 |
Lighting Controller In-depth T5/1-8, lC1-4, M+/-, Mix |
Technologies Dali, DMX, PWM |
Weather & Sunshine Weather station & forecasts |
Smart Home Functions TTS, Announcements, Bell |
 |
Unit 5 |
Operating Concept Advanced Exercise by type of room |
Daylight Control HCL Practical implementation |
Automatic Sun Position Control Protection types IR/UV/Lux |
HiFi and Ambient Sound Signum and Install 7 |
 |
Unit 6 |
Operating Concept Specific     Hotel, Office, Auditorium |
Constant Light Control Measurement, control, implementation |
Automatic Sun Position Control Optimization of parameters |
Acoustics & Sound Optimization   Optimize audio planning |
 |
Unit 7 |
Touch Pure Flex Scrolling text, master brightness |
Signalization via Light Practice example |
Operating Concept Specific Practical examples |
Audioserver in combination   Exercises Lan/Tree Turbo |
 |
Thanks for the reply, did you also find a solution for it?