Find answers, ask questions and become part of the Loxone Community.
Hi Karl
Ultimately this will depend on the physical heating arrangement. Str is a start threshold measured in % of valve actuator openings of connected IRC’s.
For instance if you had retrofitted Loxone heating into an existing heating system. Then this system may have no forms of bypass or sacrificial circuit. Therefore you would want to ensure that there is a sufficient demand on the system before the source turns on to prevent damage to the boiler by hot water coming back to it.
On a modern system there may well be suitable bypasses in place to prevent this, however you may have for instance a condensing boiler installed, therefore the boiler has to be on for a certain period to reach its condensing stage. In this instance Str would again be used to ensure a reasonable demand and to limit the risk of short cycling.
In most instances leaving at 30% will be more than adequate (roughly right is usally better than completely wrong). For more in depth info on a particular system feel free to get in touch with your Partner Coach.
KR
Hugh
 | Monday | Tuesday | Wednesday | Thursday | Friday |
---|---|---|---|---|---|
0830-0900 | Welcome | Arrival and Exchange | Arrival and Exchange | Arrival and Exchange | Arrival and Exchange |
Unit 1 | Easy Lighting Planning Square meter formulas. Room types, Direct/Indirect |
Automatic Basic Lighting Presence Sensor Air/Tree |
Shading & Automation Controls vs Automation  configuration shading types |
Multiroom Audio System, scaling, simple audio planning |
Media controller IR and RS Protocols, AVR |
Unit 2 | Intuitive Operating Concept Room types & moods |
Presence Optimization Exercises by type of room |
System Protection Functions Storm, frost, privacy, break-in |
Cabling & Configuration Audioserver Extension speaker |
Operating Concept Specific Operating modes, Touch Pure Flex |
Unit 3 | Configuration Room Types Basic Configuration |
Presence Areas Practice P/1-8 |
Optimise Protection Functions Practical exercises by type |
Operation & Connections Line In/Out, SPDIF Signal converter |
Optimise Conference Room Control and programming |
1200 | Lunch Break | Lunch Break | Lunch Break | Lunch Break | Lunch Break & wrap up |
Unit 4 | Lighting Controller In-depth T5/1-8, lC1-4, M+/-, Mix |
Technologies Dali, DMX, PWM |
Weather & Sunshine Weather station & forecasts |
Smart Home Functions TTS, Announcements, Bell |
 |
Unit 5 | Operating Concept Advanced Exercise by type of room |
Daylight Control HCL Practical implementation |
Automatic Sun Position Control Protection types IR/UV/Lux |
HiFi and Ambient Sound Signum and Install 7 |
 |
Unit 6 | Operating Concept Specific     Hotel, Office, Auditorium | Constant Light Control Measurement, control, implementation |
Automatic Sun Position Control Optimization of parameters |
Acoustics & Sound Optimization   Optimize audio planning |  |
Unit 7 | Touch Pure Flex Scrolling text, master brightness |
Signalization via Light Practice example |
Operating Concept Specific Practical examples | Audioserver in combination   Exercises Lan/Tree Turbo |  |
Booking Request for CPD
Please complete the following details as part of your request to book this CPD.
Once we have received your details, we will be in touch to discuss your request further.
From your first enquiry to the finishing touches on your project, Loxone and your Loxone Partner will be with you all the way. Benefit from the experience that we have gained through the realisation of over one hundred thousand projects worldwide to ensure your project exceeds your expectations.