Chelsea Hilton
Fact Check
Country
{{getRegion('UK')}}
Location
London
Construction year
2013
Area
15
Loxone Partner
Products
Challenge
We were asked by our client to supply a panel preconfigured and ready for installation and instructions on how to wire them.Solution
We designed, built and commissioned the system 100% off-site with instruction on installation all supplied to the electricians on-site. The panel was sent to London and installed as per our instructions. With a network cable being installed to allow me to do remote adjustments, to suit the client, off-site.I enjoy these projects as I know that the end client has a control system they can build on in the future when carrying out further upgrades. The systems flexibility and easy expansion makes it a no brainer when doing these types of project.
Peter LyttleBusiness Owner