Leitec Building Technology GmbH
Fact Check
Country
{{getRegion('DE')}}
Location
Heilbad Heiligenstadt
Construction year
2010
Area
2750 m2
Loxone Partner
Challenge
The building was already built in 2010, with a KNX and Wago installation. In 2022, we upgraded our company building to a modern Loxone installation. The difficulty was to completely replace the Wago control and seamlessly integrate the KNX installation. The focus was on not interfering with the KNX programming, continuing to operate it independently and still bringing all functions into the miniserver.Solution
Several KNX extensions were installed on the Miniserver. All button and status messages from the KNX system were used to take over all functions. The existing sound system was replaced by 4 Loxone Audioservers. The Wago SMI control system was initially replaced by KNX SMI gateways.Due to the flexibility and interface openness of Loxone, all requirements could be easily implemented.